Rules, sub-rules, and actions are executed in the order in which they are listed – items standing higher in the list are executed first. You can therefore change the execution order by moving any rule, sub-rule, or action higher or lower in the list. Note that a sub-rule can be moved only within the limits of the rule it belongs to, and an action can be moved only within the limits of the sub-rule.
Changing the execution order
- With the scheduling script opened in the View mode (go to Viewing the Existing Scheduling Script Settings for more information), go to the Rules tab in the lower frame.
- Select the rule, sub-rule, or action you wish to move and click the Move Up
or Move Down
button as appropriate.
- Click OK to confirm the move.
A confirmation dialog opens.
Figure 1 - Confirmation dialog for Move operation
The lower frame refreshes and the listed items are sorted into the new order. To move an item multiple rows, repeat the operation as necessary.